News & Bulletin Updates

8Compare the prices to see if there have been any changes over the last few days

Read more

8Analyze the price fluctuations over the past few days to determine if there have been any changes

Read more

8Get the prices for Methylene Dichloride, Chloroform, Tetrachloroethylene, Dichloroethane and Dichloropropane

Read more

8How much have the prices of alcohol products changed since yesterday? Find out

Read more

8Find more about the recent pricing changes for all the Refrigerant products and how much it has moved

Read more

8Compare prices to identify any changes

Read more

8Find out the most recent prices for Caustic Soda Lye and Caustic Soda Flake

Read more

8Analyze the price fluctuations in the Indian domestic market over the past day to determine the magnitude of any change

Read more

8Find out the latest prices of Ethylene Dichloride/ Purified Terephthalic Acid (PTA)/ Acrylonitrile and Caprolactam

Read more

8Track the domestic prices and identify if there are any changes today

Read more

8Explore the latest bulk chemical prices from the Mumbai market, updated for today
8Stay informed with comprehensive insights into key commodities and trends

Read more

Lateral drilling will be not just to evade environment ministry sanctions
8OIL wants to tap into multilayerd complex wells, and they want to drill anywhere between 25 to 40 of them over the next few years.
8So there is a lot of money waiting for contractors, and smaller contractors must know which doors to knock

Read more

The well is a depth of 5600 metres, the bottomhole pressure (BHP) is 17,754 psi, and the temperature is 120°C.
8Two companies are going to involved in drilling this well

Read more

8Up to 6550 metres, and 13,000 psi, this is anothe well that is now waiting to be drilled Abandoned at 5891metres, this ultra-high-pressure location may get a second life
8But the contract award is crawling.

Read more

ONGC’s environmental tender drew bids from Rs 47 lakh to Rs 3.4 crore.
8With nine technically qualified bidders, the spread points to either aggressive underbidding or wildly differing operational models
8This is a case for pricing vs. quality scrutiny.
8The winning vendor will oversee over 18,000 samples, covering air, stack, noise, mercury, and oil-in-cuttings across more than 80 installations and rigs.
8A massive statutory compliance exercise now rides on L1’s cost-effective execution given its low bid price.

Read more

8Are there high-risk Maoist areas in Maharashtra?
8For, surveyors must proactively route around high-risk Maoist areas and ensure pipeline accessibility through public road networks.
8That is going to be tricky

Read more

8It is very interesting, as the what is sought is a full spectrum tie-up
8And the PSU will most likely act as an agent

Read more

Foot patrolling in the North East is a tough job
8And even though such a contract can be lucrative, bidders are difficult to find
8One bidder participated but was promptly disqualified
8It could either be inability for risk tolerance, or possibly unrealistic load.

Read more

The tender scope spans both onshore (Mallavaram, Vakalapudi) and offshore (PLQP, CPPLQUP) stations — demanding hybrid manning models, 24/7 readiness, and crew rotation logistics across zones.
8Familiar names like Akshar Fire and HSE Integro will now battle it out over technical scores and pricing finesse.

Read more

ONGC’s aim to onboard more consultants alongside its existing 10 empanelled vendors was derailed as every new applicant got technically rejected.
8This is a blow to mid-tier firms looking to enter the elite pool.

Read more

The industry’s biggest names are eyeing ONGC’s real-time data aggregation contract for 36–46 rigs.
8Their pre-bid queries indicate intense focus on cloud, analytics integration, and bandwidth handling in low-connectivity zones.
8Real-time data from over 70 rigs—integrated, analyzed, and visualized centrally—is no longer a side project. ONGC’s RTDOC + Tiered Cloud/On-Prem solution signals a fundamental shift in upstream digital operations.
8ONGC revised cloud uptime to 99.9%, shortened VAPT cycles to 6 months, and defined a 6-month exit support window. Vendors must now build fault-tolerant, future-proof systems.
8With dashboards supporting 400 parameters per rig and HMIs required at both drill floor and RTDOC, the specs challenge vendors to blend hardware ruggedness with real-time data agility.

Read more

A 250 HP leverage has been given to favour contractors could tilt the field in favour of contractors with newer, higher-torque assets
8This can be a game-changer in an otherwise narrow equipment profile.

Read more

Six deadline shifts reveal a complex matrix of pre-bid clarifications, documentation overload, and possible bidder-OEM alignment struggles for India’s biggest rig charter.
8Industry insiders note that extensions often reflect backend alignment challenges — rig fabrication, crew sourcing, and logistics across different locations, requiring detailed pre-bid strategy.

Read more

With Western India awash in storage, the cost of building big may no longer add up.
8And that is the reason why this company decided to back out

Read more

Dahej pump tender draws full house—eight bids opened
8Intense competition emerges for special-purpose pump package as EIL finalizes technical scrutiny in PDH-PP project.
8Despite restricted bidding, the tender's deep technical demands signal a push for high-spec, high-performance gear.
8And bidders are willing to level up to that
Six vie for duplex heat exchanger package at Dahej PP project
8EIL's high-spec stainless steel heat exchanger tender sees aggressive participation from top fabricators amid rising duplex steel demand in Indian petrochemicals.
7 contenders in race for air cooler package
8EIL sees healthy participation as key equipment tender for Dahej propane project enters technical evaluation stage.
Heat exchanger battle heats up: 6 contenders vie for duplex SS package at PDH unit
8With major fabricators in fray, the PDH-PP project at Dahej witnesses high competition for critical heat exchanger supply.
Record-Breaking Tender Spread Of Rs. 118 crore
8The lowest bid was 1,200 times cheaper than the highest
8This is a signal of aggressive pricing or strategic sourcing in India’s valve manufacturing sector

Read more
« First  « 41 4243 44 45 »  Last
Showing 1050 - 1075 of 87004 Bulletin